![]() |
![]() |
Reconstruction of Saint-Malo port lock
Upstream part of the lock - march 1948
| |
First, the lock was isolated from the sea and the port. A bridge was assembled upstream to allow the crossing of the lock. The next task was to clear the rubble. |
| Collection Georges Jamet | Version
française |